Ute Jenks 2-1-B4 G
API 43013311970000 · Duchesne County, Utah · ALTAMONT field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 41 | 36 | 179 | 4 |
| May 2026 | 50 | 31 | 238 | 6 |
| Apr 2026 | 23 | 32 | 249 | 30 |
| Mar 2026 | 77 | 16 | 147 | 25 |
| Feb 2026 | 58 | 115 | 227 | 11 |
| Jan 2026 | 95 | 232 | 80 | 18 |
| Dec 2025 | 20 | 129 | 542 | 15 |
| Nov 2025 | 83 | 470 | 856 | 21 |
| Oct 2025 | 30 | 162 | 14 | 2 |
| Sep 2025 | 63 | 135 | 234 | 8 |
| Aug 2025 | 47 | 146 | 407 | 2 |
| Jul 2025 | 34 | 318 | 240 | 2 |
| Jun 2025 | 18 | 758 | 274 | 6 |
| May 2025 | 43 | 63 | 194 | 4 |
| Apr 2025 | 113 | 38 | 139 | 9 |
| Mar 2025 | 0 | 0 | 0 | 0 |
| Feb 2025 | 29 | 8 | 34 | 5 |
| Jan 2025 | 76 | 40 | 256 | 4 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1988-02-22 | 53 | 103 | 165 | 35 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWREPERF
Location
40.343478, -110.285477
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.