Ute Tribal 15-23
API 43013316710000 · Duchesne County, Utah · BRUNDAGE CANYON field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 36 | 540 | 16 | 30 |
| May 2026 | 40 | 538 | 16 | 31 |
| Apr 2026 | 39 | 456 | 16 | 30 |
| Mar 2026 | 45 | 493 | 16 | 31 |
| Feb 2026 | 37 | 462 | 12 | 28 |
| Jan 2026 | 42 | 459 | 16 | 31 |
| Dec 2025 | 65 | 496 | 27 | 31 |
| Nov 2025 | 22 | 432 | 16 | 30 |
| Oct 2025 | 28 | 471 | 15 | 31 |
| Sep 2025 | 45 | 481 | 19 | 30 |
| Aug 2025 | 78 | 464 | 43 | 31 |
| Jul 2025 | 50 | 446 | 14 | 31 |
| Jun 2025 | 9 | 464 | 7 | 30 |
| May 2025 | 43 | 497 | 17 | 31 |
| Apr 2025 | 46 | 501 | 15 | 30 |
| Mar 2025 | 49 | 310 | 29 | 31 |
| Feb 2025 | 22 | 203 | 16 | 28 |
| Jan 2025 | 60 | 359 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1996-11-16 | 263 | 0 | 13 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
REPERF
POWLocation
40.026595, -110.412951
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.