Ute Tribal 08-07

API 43013316910000 · Duchesne County, Utah · ANTELOPE CREEK field

PAOWPlugged 2026-05-19
API
43013316910000
Operator
Berry Petroleum Company LLC
County
Duchesne
Plugged
2026-05-19
Measured depth
6,296 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
2,608 bbl
Cumulative gas
0 MCF
Cumulative water
2,324 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 20262402131
Apr 202689013230
Mar 202684012331
Feb 202612607728
Jan 2026131011131
Dec 2025160013731
Nov 2025166014430
Oct 2025157010031
Sep 2025171011130
Aug 2025199014531
Jul 2025239020531
Jun 2025216027130
May 2025274019331
Apr 2025197025130
Mar 2025171021731
Feb 202510108628
Jan 20251030031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
1996-10-03
First production
1996-10-22
Measured depth
6,296 ft
True vertical depth
6,249 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1996-10-22792029———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

CONVERT

Completed
2022-07-05

PLUG

PAOW

Location

40.063642, -110.244977

40.06364, -110.24498 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.