Ute Tribal 7-19-55

API 43013328630000 · Duchesne County, Utah · BRUNDAGE CANYON field

POW
API
43013328630000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,325 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
348 bbl
Cumulative gas
24,198 MCF
Cumulative water
1,630 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026191,2628330
May 2026111,2976631
Apr 2026121,2567530
Mar 202661,30112131
Feb 2026131,1366328
Jan 2026211,2186131
Dec 2025141,1919331
Nov 2025101,3486330
Oct 2025451,4827431
Sep 2025221,43613730
Aug 202571,4429131
Jul 2025211,46111131
Jun 2025261,4558330
May 2025221,48914331
Apr 2025251,40116130
Mar 2025241,43510731
Feb 2025351,2599828
Jan 2025151,329031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2006-04-21
Completed
2006-11-06
First production
2006-11-07
Measured depth
6,334 ft
True vertical depth
6,334 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2006-11-191138112———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.033773, -110.488442

40.03377, -110.48844 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.