Brotherson 2-26B4

API 43013331390000 · Duchesne County, Utah · ALTAMONT field

POW
API
43013331390000
Operator
Crescent Energy Operating, LLC
County
Duchesne
Measured depth
12,600 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
7,518 bbl
Cumulative gas
7,295 MCF
Cumulative water
31,964 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20261,0851,0055,23030
May 20261,4511,3928,21631
Apr 20262,0731,4727,96830
Mar 20264272832,26231
Feb 20260164024
Jan 2026042031
Dec 20250000
Nov 20250000
Oct 202501030
Sep 20259261,1544,33230
Aug 20251,5561,1443,95631
Jul 2025057031
Jun 2025027030
May 20250256031
Apr 20250298030
Mar 20250000
Feb 20250000
Jan 20250000

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2008-08-28
Completed
2011-01-28
First production
2011-01-28
Measured depth
13,100 ft
True vertical depth
13,095 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-01-28968218842——

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW

REPERF

POW

Location

40.274132, -110.310426

40.27413, -110.31043 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.