7-7-46BTR
API 43013335650000 · Duchesne County, Utah · ALTAMONT field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 284 | 630 | 222 | 29 |
| May 2026 | 336 | 637 | 586 | 31 |
| Apr 2026 | 316 | 716 | 582 | 30 |
| Mar 2026 | 372 | 757 | 636 | 31 |
| Feb 2026 | 119 | 311 | 273 | 19 |
| Jan 2026 | 109 | 172 | 108 | 18 |
| Dec 2025 | 196 | 252 | 172 | 31 |
| Nov 2025 | 282 | 424 | 422 | 30 |
| Oct 2025 | 342 | 648 | 552 | 30 |
| Sep 2025 | 279 | 461 | 707 | 30 |
| Aug 2025 | 210 | 59 | 0 | 31 |
| Jul 2025 | 130 | 12 | 291 | 24 |
| Jun 2025 | 159 | 59 | 365 | 30 |
| May 2025 | 509 | 261 | 739 | 31 |
| Apr 2025 | 344 | 498 | 1,723 | 21 |
| Mar 2025 | 0 | 14 | 3 | 14 |
| Feb 2025 | 5 | 0 | 27 | 7 |
| Jan 2025 | 0 | 5 | 0 | 2 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2007-12-01 | 282 | 180 | 84 | 49 | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.146651, -110.605140
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.