GB II Fed I-27-8-17
API 43013338140000 · Duchesne County, Utah · MONUMENT BUTTE field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 243 | 0 | 494 | 30 |
| May 2026 | 218 | 0 | 579 | 31 |
| Apr 2026 | 146 | 0 | 610 | 30 |
| Mar 2026 | 172 | 0 | 666 | 31 |
| Feb 2026 | 151 | 0 | 553 | 27 |
| Jan 2026 | 110 | 0 | 598 | 31 |
| Dec 2025 | 100 | 0 | 681 | 31 |
| Nov 2025 | 146 | 0 | 601 | 30 |
| Oct 2025 | 139 | 0 | 723 | 31 |
| Sep 2025 | 150 | 0 | 615 | 30 |
| Aug 2025 | 135 | 0 | 646 | 31 |
| Jul 2025 | 160 | 0 | 530 | 31 |
| Jun 2025 | 102 | 0 | 627 | 30 |
| May 2025 | 196 | 0 | 625 | 31 |
| Apr 2025 | 152 | 0 | 582 | 30 |
| Mar 2025 | 142 | 0 | 621 | 31 |
| Feb 2025 | 11 | 0 | 720 | 28 |
| Jan 2025 | 371 | 0 | 638 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-04-17 | 153 | 67 | 87 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.090931, -109.985350
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.