Mon Butte Fed I-34-8-16
API 43013338710000 · Duchesne County, Utah · MONUMENT BUTTE field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 96 | 227 | 103 | 30 |
| May 2026 | 92 | 221 | 53 | 31 |
| Apr 2026 | 73 | 217 | 59 | 30 |
| Mar 2026 | 91 | 204 | 81 | 31 |
| Feb 2026 | 61 | 160 | 58 | 21 |
| Jan 2026 | 91 | 164 | 63 | 29 |
| Dec 2025 | 113 | 174 | 164 | 31 |
| Nov 2025 | 121 | 135 | 423 | 21 |
| Oct 2025 | 20 | 162 | 40 | 7 |
| Sep 2025 | 107 | 501 | 20 | 30 |
| Aug 2025 | 61 | 343 | 27 | 17 |
| Jul 2025 | 97 | 374 | 30 | 20 |
| Jun 2025 | 64 | 300 | 28 | 15 |
| May 2025 | 86 | 429 | 40 | 30 |
| Apr 2025 | 116 | 442 | 30 | 30 |
| Mar 2025 | 131 | 490 | 40 | 31 |
| Feb 2025 | 113 | 453 | 46 | 28 |
| Jan 2025 | 119 | 452 | 44 | 30 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-01-01 | 25 | 0 | 29 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.079776, -110.103094
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.