Jonah Fed M-12-9-16
API 43013340980000 · Duchesne County, Utah · MONUMENT BUTTE field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 189 | 47 | 326 | 30 |
| May 2026 | 195 | 39 | 180 | 31 |
| Apr 2026 | 129 | 12 | 103 | 7 |
| Mar 2026 | 244 | 52 | 315 | 26 |
| Feb 2026 | 187 | 71 | 159 | 17 |
| Jan 2026 | 218 | 124 | 198 | 31 |
| Dec 2025 | 393 | 103 | 291 | 27 |
| Nov 2025 | 0 | 0 | 0 | 0 |
| Oct 2025 | 21 | 24 | 14 | 8 |
| Sep 2025 | 66 | 0 | 114 | 10 |
| Aug 2025 | 272 | 0 | 230 | 31 |
| Jul 2025 | 190 | 0 | 125 | 31 |
| Jun 2025 | 184 | 0 | 133 | 30 |
| May 2025 | 173 | 0 | 200 | 31 |
| Apr 2025 | 112 | 0 | 142 | 30 |
| Mar 2025 | 272 | 7 | 64 | 31 |
| Feb 2025 | 162 | 54 | 166 | 28 |
| Jan 2025 | 232 | 72 | 95 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-05-12 | 172 | 0 | 27 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.043925, -110.070882
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.