Sundance Fed P-11-9-17

API 43013341440000 · Duchesne County, Utah · MONUMENT BUTTE field

POW
API
43013341440000
Operator
Scout Energy Management, LLC
County
Duchesne
Measured depth
5,865 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
3,000 bbl
Cumulative gas
2,044 MCF
Cumulative water
1,401 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202616712815330
May 20261547612431
Apr 202616514412930
Mar 2026143719124
Feb 20261581376528
Jan 20261761419831
Dec 2025188907631
Nov 2025151916730
Oct 20251701235631
Sep 20251751215430
Aug 2025167935431
Jul 2025173926231
Jun 20251391345724
May 20251771527831
Apr 20251671746030
Mar 2025179965431
Feb 2025168866028
Jan 2025183956331

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2010-03-22
Completed
2010-04-16
First production
2010-04-15
Measured depth
5,920 ft
True vertical depth
5,812 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-04-2721025———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

Location

40.040025, -109.980948

40.04002, -109.98095 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.