S Monument Butte St L-2-9-16

API 43013501990000 · Duchesne County, Utah · MONUMENT BUTTE field

POW
API
43013501990000
Operator
Scout Energy Management, LLC
County
Duchesne
Measured depth
6,325 ft
True vertical depth
6,325 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
1,200 bbl
Cumulative gas
53 MCF
Cumulative water
15,422 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202675257530
May 202681278631
Apr 20267721,07130
Mar 20268021,16931
Feb 20267121,05028
Jan 202680290431
Dec 20250284431
Nov 202578299630
Oct 202583298231
Sep 202578287330
Aug 202584289831
Jul 202579287731
Jun 202583290330
May 202577282431
Apr 20257821,11130
Mar 2025801113
Feb 20251811748
Jan 202570221,27431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2010-07-14
Completed
2010-11-12
First production
2010-11-11
Measured depth
6,281 ft
True vertical depth
6,151 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2010-11-251079———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.061359, -110.078806

40.06136, -110.07881 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.