Ute Tribal 12-26-4-3
API 43013503160000 · Duchesne County, Utah · SOUTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 0 | 1,149 | 191 | 31 |
| Apr 2026 | 83 | 1,202 | 262 | 30 |
| Mar 2026 | 5 | 1,298 | 556 | 31 |
| Feb 2026 | 11 | 1,064 | 142 | 28 |
| Jan 2026 | 21 | 1,159 | 410 | 31 |
| Dec 2025 | 4 | 1,248 | 452 | 31 |
| Nov 2025 | 48 | 1,272 | 397 | 30 |
| Oct 2025 | 28 | 1,347 | 310 | 31 |
| Sep 2025 | 63 | 1,349 | 452 | 30 |
| Aug 2025 | 49 | 1,418 | 426 | 31 |
| Jul 2025 | 36 | 1,957 | 367 | 31 |
| Jun 2025 | 62 | 777 | 310 | 30 |
| May 2025 | 122 | 871 | 446 | 31 |
| Apr 2025 | 37 | 901 | 1,116 | 29 |
| Mar 2025 | 62 | 1,014 | 565 | 31 |
| Feb 2025 | 52 | 1,208 | 277 | 24 |
| Jan 2025 | 56 | 1,594 | 555 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-09-15 | 99 | 5 | 260 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.104123, -110.196847
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.