Meagher 10-20-4-2
API 43013504000000 · Duchesne County, Utah · SOUTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 0 | 499 | 0 | 31 |
| Apr 2026 | 0 | 571 | 0 | 30 |
| Mar 2026 | 19 | 1,866 | 130 | 29 |
| Feb 2026 | 41 | 1,670 | 43 | 25 |
| Jan 2026 | 26 | 1,858 | 87 | 31 |
| Dec 2025 | 24 | 1,831 | 93 | 31 |
| Nov 2025 | 27 | 1,797 | 92 | 30 |
| Oct 2025 | 33 | 1,762 | 121 | 31 |
| Sep 2025 | 25 | 1,689 | 76 | 30 |
| Aug 2025 | 11 | 1,865 | 93 | 31 |
| Jul 2025 | 31 | 1,654 | 105 | 31 |
| Jun 2025 | 20 | 1,763 | 143 | 30 |
| May 2025 | 41 | 1,841 | 62 | 27 |
| Apr 2025 | 59 | 1,847 | 123 | 30 |
| Mar 2025 | 24 | 1,845 | 75 | 29 |
| Feb 2025 | 25 | 1,651 | 78 | 28 |
| Jan 2025 | 29 | 1,834 | 138 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-01-10 | 356 | 80 | 307 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.118575, -110.130925
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.