Lamb 1-19-3-1
API 43013504250000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 285 | 368 | 745 | 31 |
| Apr 2026 | 298 | 342 | 759 | 30 |
| Mar 2026 | 304 | 346 | 800 | 31 |
| Feb 2026 | 277 | 307 | 784 | 28 |
| Jan 2026 | 306 | 318 | 990 | 31 |
| Dec 2025 | 307 | 366 | 876 | 31 |
| Nov 2025 | 302 | 345 | 852 | 30 |
| Oct 2025 | 325 | 398 | 935 | 31 |
| Sep 2025 | 279 | 384 | 1,051 | 30 |
| Aug 2025 | 361 | 383 | 929 | 31 |
| Jul 2025 | 448 | 596 | 1,198 | 31 |
| Jun 2025 | 301 | 328 | 855 | 26 |
| May 2025 | 398 | 308 | 815 | 31 |
| Apr 2025 | 326 | 422 | 1,133 | 30 |
| Mar 2025 | 463 | 366 | 731 | 31 |
| Feb 2025 | 307 | 302 | 497 | 28 |
| Jan 2025 | 435 | 331 | 1,014 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-09-05 | 328 | 255 | 428 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.211933, -110.044360
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.