Giles 1-19-3-2
API 43013504260000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 16 | 0 | 1,974 | 31 |
| Apr 2026 | 70 | 291 | 3,043 | 20 |
| Mar 2026 | 34 | 169 | 5 | 4 |
| Feb 2026 | 278 | 2,065 | 406 | 28 |
| Jan 2026 | 274 | 1,394 | 478 | 31 |
| Dec 2025 | 254 | 1,122 | 379 | 25 |
| Nov 2025 | 318 | 1,113 | 459 | 30 |
| Oct 2025 | 341 | 1,097 | 533 | 29 |
| Sep 2025 | 113 | 490 | 405 | 7 |
| Aug 2025 | 429 | 1,251 | 294 | 31 |
| Jul 2025 | 348 | 1,232 | 311 | 31 |
| Jun 2025 | 245 | 1,206 | 583 | 30 |
| May 2025 | 502 | 1,181 | 550 | 31 |
| Apr 2025 | 355 | 1,124 | 684 | 30 |
| Mar 2025 | 300 | 982 | 378 | 31 |
| Feb 2025 | 793 | 971 | 0 | 28 |
| Jan 2025 | 618 | 1,068 | 200 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-03-21 | 1,211 | 699 | 453 | — | — | 23 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.212791, -110.147256
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.