1-13D-47 BTR
API 43013504450000 · Duchesne County, Utah · ALTAMONT field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 170 | 364 | 15 | 30 |
| May 2026 | 207 | 306 | 0 | 31 |
| Apr 2026 | 196 | 189 | 11 | 30 |
| Mar 2026 | 181 | 185 | 2 | 31 |
| Feb 2026 | 175 | 249 | 0 | 28 |
| Jan 2026 | 174 | 353 | 10 | 31 |
| Dec 2025 | 220 | 206 | 0 | 31 |
| Nov 2025 | 233 | 358 | 28 | 30 |
| Oct 2025 | 193 | 652 | 0 | 31 |
| Sep 2025 | 193 | 681 | 10 | 30 |
| Aug 2025 | 282 | 696 | 0 | 31 |
| Jul 2025 | 183 | 677 | 18 | 31 |
| Jun 2025 | 215 | 787 | 0 | 30 |
| May 2025 | 218 | 517 | 62 | 31 |
| Apr 2025 | 217 | 560 | 101 | 30 |
| Mar 2025 | 336 | 397 | 100 | 31 |
| Feb 2025 | 107 | 249 | 16 | 6 |
| Jan 2025 | 51 | 122 | 0 | 3 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-10-25 | 350 | 1,702 | 615 | 62 | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.137642, -110.616073
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.