7-26-37 BTR

API 43013506410000 · Duchesne County, Utah · CEDAR RIM field

POW
API
43013506410000
Operator
Scout Energy Management, LLC
County
Duchesne
Measured depth
10,400 ft
True vertical depth
10,400 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
1,432 bbl
Cumulative gas
3,443 MCF
Cumulative water
10,197 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20262434422,61330
May 20263935341,88618
Apr 20260000
Mar 202601031
Feb 202601028
Jan 20260000
Dec 202502030
Nov 20250505
Oct 20250301
Sep 20250000
Aug 202504031
Jul 20250151031
Jun 20250307030
May 20250658131
Apr 20251564842,20830
Mar 20252175342,48531
Feb 20254233171,0049
Jan 20250000

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Spudded
2011-09-04
Completed
2011-10-18
First production
2011-10-18
Measured depth
9,969 ft
True vertical depth
9,966 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2011-10-2015219364552—24

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW
Completed
2012-06-13

Location

40.192338, -110.641000

40.19234, -110.64100 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.