GMBU S-30-8-17
API 43013508240000 · Duchesne County, Utah · MONUMENT BUTTE field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 272 | 12 | 150 | 30 |
| May 2026 | 295 | 14 | 161 | 31 |
| Apr 2026 | 243 | 19 | 147 | 26 |
| Mar 2026 | 297 | 19 | 183 | 31 |
| Feb 2026 | 104 | 0 | 73 | 11 |
| Jan 2026 | 173 | 77 | 104 | 18 |
| Dec 2025 | 0 | 138 | 181 | 31 |
| Nov 2025 | 292 | 144 | 210 | 30 |
| Oct 2025 | 296 | 111 | 181 | 30 |
| Sep 2025 | 288 | 140 | 153 | 30 |
| Aug 2025 | 312 | 163 | 164 | 31 |
| Jul 2025 | 294 | 134 | 151 | 31 |
| Jun 2025 | 308 | 0 | 170 | 30 |
| May 2025 | 285 | 0 | 154 | 31 |
| Apr 2025 | 274 | 0 | 113 | 29 |
| Mar 2025 | 284 | 0 | 119 | 31 |
| Feb 2025 | 229 | 0 | 119 | 28 |
| Jan 2025 | 169 | 0 | 79 | 20 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-04-21 | 158 | 70 | 68 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.087066, -110.046907
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.