Conrad 6-17-3-1W
API 43013508570000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 241 | 138 | 393 | 31 |
| Apr 2026 | 224 | 141 | 299 | 30 |
| Mar 2026 | 253 | 154 | 406 | 29 |
| Feb 2026 | 201 | 133 | 316 | 25 |
| Jan 2026 | 269 | 163 | 356 | 31 |
| Dec 2025 | 257 | 151 | 364 | 31 |
| Nov 2025 | 267 | 154 | 415 | 28 |
| Oct 2025 | 223 | 152 | 465 | 29 |
| Sep 2025 | 267 | 164 | 486 | 30 |
| Aug 2025 | 299 | 170 | 490 | 31 |
| Jul 2025 | 272 | 173 | 587 | 30 |
| Jun 2025 | 232 | 161 | 616 | 27 |
| May 2025 | 266 | 192 | 594 | 27 |
| Apr 2025 | 321 | 175 | 1,006 | 27 |
| Mar 2025 | 277 | 147 | 604 | 31 |
| Feb 2025 | 301 | 156 | 578 | 28 |
| Jan 2025 | 489 | 239 | 1,073 | 29 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-01-21 | 139 | 113 | 190 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.223106, -110.022930
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.