Ute Tribal 16-11-55

API 43013508880000 · Duchesne County, Utah · BRUNDAGE CANYON field

POW
API
43013508880000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
8,000 ft
True vertical depth
8,000 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
660 bbl
Cumulative gas
18,004 MCF
Cumulative water
1,217 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026409618230
May 2026389954231
Apr 2026217814630
Mar 2026479548931
Feb 2026268984828
Jan 2026379816131
Dec 2025391,0647931
Nov 2025391,0326230
Oct 2025321,0906731
Sep 2025301,0178630
Aug 2025481,07910731
Jul 2025401,07611131
Jun 2025381,0558730
May 2025421,0639831
Apr 2025231,0613230
Mar 2025361,0016731
Feb 2025378835328
Jan 2025471,013031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
2012-12-24
First production
2012-12-24
Measured depth
7,302 ft
True vertical depth
7,302 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-12-250082———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.055675, -110.408809

40.05568, -110.40881 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.