State 11-5-3-1W
API 43013510430000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 292 | 238 | 365 | 31 |
| Apr 2026 | 332 | 252 | 354 | 30 |
| Mar 2026 | 261 | 196 | 281 | 29 |
| Feb 2026 | 285 | 207 | 303 | 28 |
| Jan 2026 | 379 | 243 | 293 | 31 |
| Dec 2025 | 199 | 241 | 466 | 31 |
| Nov 2025 | 425 | 233 | 218 | 30 |
| Oct 2025 | 336 | 239 | 341 | 31 |
| Sep 2025 | 297 | 230 | 327 | 30 |
| Aug 2025 | 317 | 149 | 354 | 31 |
| Jul 2025 | 297 | 170 | 314 | 31 |
| Jun 2025 | 329 | 204 | 327 | 30 |
| May 2025 | 330 | 192 | 359 | 31 |
| Apr 2025 | 323 | 232 | 357 | 30 |
| Mar 2025 | 331 | 97 | 350 | 31 |
| Feb 2025 | 292 | 150 | 317 | 28 |
| Jan 2025 | 335 | 233 | 371 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-05-05 | 213 | 117 | 168 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.249440, -110.020823
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.