State 11-5-3-1W

API 43013510430000 · Duchesne County, Utah · NORTH MYTON BENCH field

POW
API
43013510430000
Operator
FourPoint Resources, LLC
County
Duchesne
Measured depth
10,800 ft
True vertical depth
10,800 ft

Production

17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.

Cumulative oil
5,360 bbl
Cumulative gas
3,506 MCF
Cumulative water
5,697 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
May 202629223836531
Apr 202633225235430
Mar 202626119628129
Feb 202628520730328
Jan 202637924329331
Dec 202519924146631
Nov 202542523321830
Oct 202533623934131
Sep 202529723032730
Aug 202531714935431
Jul 202529717031431
Jun 202532920432730
May 202533019235931
Apr 202532323235730
Mar 20253319735031
Feb 202529215031728
Jan 202533523337131

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
2012-04-28
First production
2012-04-28
Measured depth
10,430 ft
True vertical depth
10,430 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-05-05213117168———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.249440, -110.020823

40.24944, -110.02082 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.