LC Tribal 16-30D-56

API 43013511320000 · Duchesne County, Utah · LAKE CANYON field

POW
API
43013511320000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
7,355 ft
True vertical depth
7,591 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
826 bbl
Cumulative gas
7,433 MCF
Cumulative water
5,241 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20263757719430
May 20265651420331
Apr 20263351721330
Mar 20265956322431
Feb 20264353721428
Jan 20264648927431
Dec 20255949632731
Nov 20254832943030
Oct 20254130020231
Sep 20251932525630
Aug 20255541531531
Jul 20257041433531
Jun 20254630134130
May 20255940441331
Apr 20256540743230
Mar 20259041286831
Feb 2025091028
Jan 20250342031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2012-06-01
Completed
2012-10-17
First production
2012-09-19
Measured depth
7,591 ft
True vertical depth
7,328 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2012-10-011894146———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.016522, -110.593915

40.01652, -110.59391 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.