13-22-22 South Altamont
API 43013511600000 · Duchesne County, Utah · BLUEBELL field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 11 | 0 | 1 | 11 |
| Apr 2026 | 0 | 0 | 0 | 0 |
| Mar 2026 | 0 | 0 | 0 | 0 |
| Feb 2026 | 0 | 0 | 27 | 4 |
| Jan 2026 | 155 | 281 | 604 | 18 |
| Dec 2025 | 388 | 641 | 1,935 | 30 |
| Nov 2025 | 286 | 530 | 1,489 | 29 |
| Oct 2025 | 326 | 618 | 1,760 | 31 |
| Sep 2025 | 385 | 731 | 2,060 | 30 |
| Aug 2025 | 360 | 544 | 1,957 | 31 |
| Jul 2025 | 383 | 473 | 1,829 | 31 |
| Jun 2025 | 229 | 336 | 1,476 | 30 |
| May 2025 | 377 | 701 | 2,018 | 31 |
| Apr 2025 | 343 | 491 | 1,817 | 30 |
| Mar 2025 | 323 | 335 | 1,478 | 30 |
| Feb 2025 | 189 | 36 | 1,264 | 27 |
| Jan 2025 | 265 | 393 | 1,545 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-10-15 | 410 | 480 | 1,248 | 52 | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWLocation
40.289201, -110.102390
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.