L H Trust 3A-30-3-2W
API 43013511610000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 263 | 273 | 421 | 31 |
| Apr 2026 | 263 | 259 | 526 | 30 |
| Mar 2026 | 261 | 239 | 687 | 29 |
| Feb 2026 | 228 | 244 | 640 | 28 |
| Jan 2026 | 279 | 268 | 522 | 31 |
| Dec 2025 | 275 | 278 | 376 | 31 |
| Nov 2025 | 235 | 287 | 621 | 30 |
| Oct 2025 | 243 | 283 | 941 | 31 |
| Sep 2025 | 343 | 288 | 717 | 30 |
| Aug 2025 | 263 | 296 | 794 | 31 |
| Jul 2025 | 281 | 295 | 670 | 31 |
| Jun 2025 | 274 | 286 | 1,036 | 30 |
| May 2025 | 265 | 251 | 735 | 31 |
| Apr 2025 | 198 | 297 | 803 | 30 |
| Mar 2025 | 282 | 274 | 211 | 31 |
| Feb 2025 | 254 | 264 | 0 | 28 |
| Jan 2025 | 280 | 304 | 403 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-02-25 | 587 | 478 | 444 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.198109, -110.152644
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.