Cesspooch 15-21-3-3W
API 43013514350000 · Duchesne County, Utah · NORTH MYTON BENCH field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 202 | 168 | 344 | 31 |
| Apr 2026 | 162 | 164 | 231 | 30 |
| Mar 2026 | 170 | 171 | 429 | 31 |
| Feb 2026 | 155 | 217 | 377 | 27 |
| Jan 2026 | 64 | 294 | 304 | 21 |
| Dec 2025 | 122 | 295 | 217 | 28 |
| Nov 2025 | 147 | 182 | 273 | 30 |
| Oct 2025 | 202 | 172 | 51 | 31 |
| Sep 2025 | 151 | 216 | 11 | 30 |
| Aug 2025 | 175 | 177 | 205 | 31 |
| Jul 2025 | 209 | 179 | 245 | 31 |
| Jun 2025 | 93 | 181 | 329 | 30 |
| May 2025 | 113 | 183 | 216 | 25 |
| Apr 2025 | 182 | 180 | 352 | 30 |
| Mar 2025 | 172 | 178 | 301 | 31 |
| Feb 2025 | 289 | 195 | 458 | 28 |
| Jan 2025 | 409 | 230 | 108 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-09-10 | 192 | 195 | 338 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.201755, -110.225529
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.