Hand 7-8D-5-4

API 43013517010000 · Duchesne County, Utah · BRUNDAGE CANYON field

POW
API
43013517010000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,512 ft
True vertical depth
6,500 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
990 bbl
Cumulative gas
15,463 MCF
Cumulative water
4,345 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20264570625130
May 20264668926531
Apr 20264867724330
Mar 20265474724831
Feb 20265066624428
Jan 20264170928131
Dec 20255973226131
Nov 20255493525930
Oct 20256098925531
Sep 20255497724830
Aug 2025601,02627931
Jul 2025581,03127631
Jun 2025601,00024130
May 20255994127831
Apr 20255791120930
Mar 20256793526831
Feb 20254984123928
Jan 202569951031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Completed
2013-01-31
First production
2013-01-31
Measured depth
6,745 ft
True vertical depth
6,723 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-01-31806877——30

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.061836, -110.357832

40.06184, -110.35783 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.