Kendall 3-15B2
API 43013521280000 · Duchesne County, Utah · BLUEBELL field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 13 | 0 | 0 | 1 |
| Apr 2026 | 0 | 0 | 0 | 0 |
| Mar 2026 | 0 | 0 | 0 | 0 |
| Feb 2026 | 0 | 0 | 36 | 1 |
| Jan 2026 | 230 | 248 | 514 | 15 |
| Dec 2025 | 478 | 626 | 1,255 | 31 |
| Nov 2025 | 459 | 658 | 1,131 | 30 |
| Oct 2025 | 468 | 669 | 1,121 | 28 |
| Sep 2025 | 456 | 686 | 1,107 | 30 |
| Aug 2025 | 469 | 681 | 1,162 | 31 |
| Jul 2025 | 483 | 648 | 1,185 | 31 |
| Jun 2025 | 478 | 585 | 1,145 | 30 |
| May 2025 | 653 | 700 | 1,347 | 31 |
| Apr 2025 | 253 | 400 | 678 | 24 |
| Mar 2025 | 498 | 652 | 1,213 | 31 |
| Feb 2025 | 430 | 583 | 1,129 | 28 |
| Jan 2025 | 505 | 658 | 1,555 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-06-01 | 1,303 | 1,926 | 481 | 42.4 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWLocation
40.313873, -110.089177
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.