Ute Tribal 16-35D-54
API 43013522300000 · Duchesne County, Utah · BRUNDAGE CANYON field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 64 | 445 | 76 | 30 |
| May 2026 | 79 | 542 | 139 | 31 |
| Apr 2026 | 84 | 542 | 155 | 30 |
| Mar 2026 | 85 | 538 | 139 | 31 |
| Feb 2026 | 76 | 342 | 144 | 28 |
| Jan 2026 | 84 | 485 | 181 | 31 |
| Dec 2025 | 83 | 410 | 172 | 31 |
| Nov 2025 | 86 | 426 | 166 | 30 |
| Oct 2025 | 88 | 436 | 173 | 31 |
| Sep 2025 | 85 | 470 | 186 | 30 |
| Aug 2025 | 95 | 498 | 238 | 31 |
| Jul 2025 | 121 | 513 | 215 | 31 |
| Jun 2025 | 110 | 448 | 330 | 30 |
| May 2025 | 6 | 364 | 15 | 31 |
| Apr 2025 | 94 | 438 | 117 | 30 |
| Mar 2025 | 103 | 434 | 151 | 31 |
| Feb 2025 | 111 | 312 | 122 | 28 |
| Jan 2025 | 114 | 285 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-04-01 | 55 | 9 | 80 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.997884, -110.299964
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.