Ute Tribal 16-4D-54

API 43013523020000 · Duchesne County, Utah · BRUNDAGE CANYON field

POW
API
43013523020000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
7,490 ft
True vertical depth
7,282 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
828 bbl
Cumulative gas
4,587 MCF
Cumulative water
616 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026402585330
May 2026602614031
Apr 2026452374630
Mar 2026431454431
Feb 2026371283228
Jan 2026411513931
Dec 2025361714331
Nov 2025402403530
Oct 2025452375631
Sep 2025432853030
Aug 2025492923131
Jul 2025503262331
Jun 2025403341630
May 2025683323131
Apr 2025603394630
Mar 2025413072731
Feb 2025412572428
Jan 202549287031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2014-03-04
Completed
2014-02-26
First production
2014-03-08
Measured depth
7,212 ft
True vertical depth
6,989 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-03-10744171———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.073297, -110.335606

40.07330, -110.33561 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.