State Tribal 7-7D-54
API 43013524260000 · Duchesne County, Utah · BRUNDAGE CANYON field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 34 | 626 | 54 | 30 |
| May 2026 | 43 | 682 | 48 | 31 |
| Apr 2026 | 34 | 579 | 31 | 30 |
| Mar 2026 | 68 | 731 | 65 | 31 |
| Feb 2026 | 39 | 646 | 90 | 28 |
| Jan 2026 | 33 | 703 | 69 | 31 |
| Dec 2025 | 15 | 718 | 31 | 31 |
| Nov 2025 | 36 | 824 | 33 | 30 |
| Oct 2025 | 77 | 675 | 52 | 31 |
| Sep 2025 | 43 | 708 | 95 | 30 |
| Aug 2025 | 39 | 582 | 99 | 31 |
| Jul 2025 | 31 | 744 | 76 | 31 |
| Jun 2025 | 56 | 766 | 69 | 30 |
| May 2025 | 46 | 747 | 84 | 31 |
| Apr 2025 | 35 | 764 | 71 | 30 |
| Mar 2025 | 68 | 828 | 131 | 31 |
| Feb 2025 | 30 | 739 | 139 | 28 |
| Jan 2025 | 24 | 916 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
DIRECTIONALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-07-01 | 38 | 22 | 207 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.063990, -110.374474
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.