Ute Tribal 04-05I

API 43013526190000 · Duchesne County, Utah · ANTELOPE CREEK field

POW
API
43013526190000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,609 ft
True vertical depth
6,540 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
7,880 bbl
Cumulative gas
0 MCF
Cumulative water
22,584 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202634901,37030
May 202634801,01931
Apr 2026191064130
Mar 2026326077831
Feb 2026269073828
Jan 2026288075031
Dec 202530902,45731
Nov 2025320062930
Oct 2025420075331
Sep 2025356058630
Aug 2025315065931
Jul 202554901,21431
Jun 2025192078412
May 202531701,51331
Apr 202565002,80130
Mar 202595203,45331
Feb 202580602,43928
Jan 20259230031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2014-07-14
Completed
2015-02-18
First production
2014-11-10
Measured depth
6,521 ft
True vertical depth
6,458 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-12-29381026040.1—32

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.076984, -110.235072

40.07698, -110.23507 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.