Ute Tribal 17-03

API 43013526280000 · Duchesne County, Utah · ANTELOPE CREEK field

POW
API
43013526280000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,118 ft
True vertical depth
6,033 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
964 bbl
Cumulative gas
4,638 MCF
Cumulative water
1,146 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026482215030
May 2026542316531
Apr 202610522413030
Mar 20262823112331
Feb 20260211028
Jan 20262229231
Dec 2025162301131
Nov 2025572816730
Oct 2025602907631
Sep 2025672777030
Aug 2025622868131
Jul 20258628611831
Jun 2025572836730
May 2025632736331
Apr 2025612766930
Mar 2025772808331
Feb 2025602507128
Jan 202561279031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Spudded
2014-07-08
Completed
2014-09-10
First production
2014-09-10
Measured depth
5,993 ft
True vertical depth
5,914 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-10-1276705239.7—32

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

Location

40.053311, -110.250918

40.05331, -110.25092 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.