LC Tribal 3-22D-56

API 43013526640000 · Duchesne County, Utah · LAKE CANYON field

POW
API
43013526640000
Operator
Berry Petroleum Company LLC
County
Duchesne
Measured depth
6,804 ft
True vertical depth
6,781 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
2,850 bbl
Cumulative gas
11,241 MCF
Cumulative water
2,596 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 2026916517930
May 202613168113531
Apr 202619665517530
Mar 202619767123531
Feb 202643160230728
Jan 2026116459831
Dec 20251056545731
Nov 202536066926630
Oct 20253619431
Sep 2025435666530
Aug 2025445124931
Jul 202522552526131
Jun 202511248412530
May 202514259411131
Apr 202532372028530
Mar 202541570934431
Feb 20250508028
Jan 202521776031

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Completed
2014-07-30
First production
2014-08-01
Measured depth
6,835 ft
True vertical depth
6,814 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-08-051040120———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

40.038544, -110.548328

40.03854, -110.54833 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.