UDOT 2-1C5

API 43013529050000 · Duchesne County, Utah · ALTAMONT field

SOW
API
43013529050000
Operator
Crescent Energy Operating, LLC
County
Duchesne
Measured depth
12,300 ft
True vertical depth
12,300 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
724 bbl
Cumulative gas
7,704 MCF
Cumulative water
8,363 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20260000
May 20260000
Apr 2026064030
Mar 2026074031
Feb 2026092028
Jan 20260108031
Dec 20250152031
Nov 20250628030
Oct 202501,226031
Sep 20250720023
Aug 20250280031
Jul 20250168031
Jun 2025018701
May 2025032001
Apr 20250318030
Mar 2025947901,41331
Feb 20252921,1502,92628
Jan 20253381,4274,02431

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

DIRECTIONALPOW
Completed
2014-11-06
First production
2014-11-07
Measured depth
12,650 ft
True vertical depth
12,609 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-11-1992113145—3

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

RECOMP

POW
Completed
2017-02-08

REPERF

Location

40.255174, -110.402267

40.25517, -110.40227 · Surface location as filed with Utah

Every well in Duchesne County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.