Moon 3-33C4
API 43013532570000 · Duchesne County, Utah · ALTAMONT field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 0 | 95 | 0 | 30 |
| May 2026 | 0 | 44 | 0 | 24 |
| Apr 2026 | 0 | 106 | 0 | 30 |
| Mar 2026 | 0 | 226 | 0 | 31 |
| Feb 2026 | 2 | 383 | 0 | 28 |
| Jan 2026 | 205 | 1,187 | 347 | 31 |
| Dec 2025 | 588 | 1,479 | 869 | 31 |
| Nov 2025 | 182 | 320 | 460 | 30 |
| Oct 2025 | 196 | 383 | 606 | 31 |
| Sep 2025 | 192 | 463 | 590 | 30 |
| Aug 2025 | 249 | 793 | 585 | 31 |
| Jul 2025 | 262 | 896 | 570 | 31 |
| Jun 2025 | 282 | 877 | 639 | 30 |
| May 2025 | 248 | 817 | 600 | 31 |
| Apr 2025 | 283 | 853 | 401 | 30 |
| Mar 2025 | 347 | 1,072 | 719 | 31 |
| Feb 2025 | 542 | 996 | 782 | 28 |
| Jan 2025 | 0 | 17 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2017-07-31 | 443 | 312 | 589 | 43 | — | 26 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.174990, -110.345480
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.