Alpine Ranch 3-34B4
API 43013538010000 · Duchesne County, Utah · ALTAMONT field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 82 | 727 | 34 | 30 |
| May 2026 | 100 | 271 | 79 | 31 |
| Apr 2026 | 70 | 25 | 92 | 30 |
| Mar 2026 | 116 | 215 | 101 | 27 |
| Feb 2026 | 86 | 49 | 99 | 28 |
| Jan 2026 | 98 | 43 | 67 | 31 |
| Dec 2025 | 123 | 38 | 106 | 31 |
| Nov 2025 | 65 | 31 | 103 | 30 |
| Oct 2025 | 110 | 57 | 50 | 31 |
| Sep 2025 | 95 | 54 | 90 | 24 |
| Aug 2025 | 66 | 48 | 9 | 16 |
| Jul 2025 | 41 | 176 | 6 | 25 |
| Jun 2025 | 178 | 551 | 160 | 27 |
| May 2025 | 94 | 635 | 38 | 31 |
| Apr 2025 | 0 | 212 | 0 | 1 |
| Mar 2025 | 204 | 250 | 1,880 | 24 |
| Feb 2025 | 307 | 424 | 3,258 | 28 |
| Jan 2025 | 352 | 651 | 4,223 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-09-25 | 1,120 | 0 | 902 | 43 | — | 18 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.263647, -110.319835
Every well in Duchesne County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.