Clawson Spring St E-6

API 43015304740000 · Emery County, Utah · DRUNKARDS WASH field

PGW
API
43015304740000
Operator
Urban Oil & Gas Group, LLC
County
Emery
Measured depth
4,500 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
0 bbl
Cumulative gas
37,801 MCF
Cumulative water
16,945 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 202601,99811530
May 202602,06811831
Apr 202602,04010830
Mar 202602,04010831
Feb 202601,8539228
Jan 202602,1339831
Dec 202502,16715330
Nov 202502,1154,60230
Oct 202502,1813,40731
Sep 202502,09693630
Aug 202502,10982331
Jul 202502,20495531
Jun 202502,13193630
May 202502,20297031
Apr 202502,09790630
Mar 202502,16685431
Feb 202501,98083928
Jan 202502,22192531

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPGW
Spudded
2000-11-10
Completed
2001-03-08
First production
2001-03-08
Measured depth
3,600 ft
True vertical depth
3,600 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2001-03-0508270———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.442942, -110.959291

39.44294, -110.95929 · Surface location as filed with Utah

Every well in Emery County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.