St of Ut T 36-100
API 43015305060000 · Emery County, Utah · BUZZARD BENCH field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 0 | 2,111 | 202 | 30 |
| May 2026 | 0 | 2,306 | 215 | 31 |
| Apr 2026 | 0 | 2,146 | 203 | 30 |
| Mar 2026 | 0 | 2,146 | 203 | 31 |
| Feb 2026 | 0 | 2,053 | 174 | 28 |
| Jan 2026 | 0 | 2,314 | 211 | 31 |
| Dec 2025 | 0 | 2,202 | 227 | 30 |
| Nov 2025 | 0 | 2,158 | 126 | 30 |
| Oct 2025 | 0 | 2,350 | 210 | 31 |
| Sep 2025 | 0 | 2,261 | 203 | 30 |
| Aug 2025 | 0 | 2,312 | 205 | 31 |
| Jul 2025 | 0 | 2,339 | 208 | 31 |
| Jun 2025 | 0 | 2,323 | 210 | 30 |
| May 2025 | 0 | 2,420 | 188 | 31 |
| Apr 2025 | 0 | 2,241 | 160 | 30 |
| Mar 2025 | 0 | 2,344 | 186 | 31 |
| Feb 2025 | 0 | 2,152 | 179 | 28 |
| Jan 2025 | 0 | 2,405 | 205 | 30 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2002-10-30 | — | 0 | 217 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.387739, -111.081145
Every well in Emery County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.