Westwater Unit 3
API 43019308530000 · Grand County, Utah · WESTWATER field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 13 | 2,721 | 0 | 27 |
| May 2026 | 3 | 2,688 | 0 | 24 |
| Apr 2026 | 22 | 2,621 | 0 | 29 |
| Mar 2026 | 12 | 2,797 | 0 | 27 |
| Feb 2026 | 25 | 2,386 | 0 | 28 |
| Jan 2026 | 38 | 2,732 | 0 | 31 |
| Dec 2025 | 8 | 2,889 | 0 | 31 |
| Nov 2025 | 5 | 2,815 | 0 | 28 |
| Oct 2025 | 11 | 3,114 | 0 | 30 |
| Sep 2025 | 3 | 2,179 | 0 | 20 |
| Aug 2025 | 5 | 2,910 | 0 | 30 |
| Jul 2025 | 8 | 2,874 | 0 | 31 |
| Jun 2025 | 7 | 2,914 | 0 | 30 |
| May 2025 | 15 | 3,271 | 0 | 31 |
| Apr 2025 | 9 | 2,438 | 0 | 23 |
| Mar 2025 | 24 | 2,874 | 0 | 31 |
| Feb 2025 | 16 | 2,587 | 0 | 28 |
| Jan 2025 | 30 | 2,858 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALSGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1982-01-30 | 0 | 350 | 0 | — | — | 48 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
PGWLocation
39.332642, -109.327456
Every well in Grand County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.