WMU 4-42
API 43037300780000 · San Juan County, Utah · GREATER ANETH field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 180 | 54 | 642 | 30 |
| May 2026 | 177 | 60 | 563 | 31 |
| Apr 2026 | 175 | 55 | 516 | 30 |
| Mar 2026 | 189 | 54 | 515 | 31 |
| Feb 2026 | 164 | 51 | 442 | 28 |
| Jan 2026 | 194 | 61 | 812 | 31 |
| Dec 2025 | 203 | 56 | 698 | 31 |
| Nov 2025 | 194 | 59 | 628 | 30 |
| Oct 2025 | 206 | 47 | 548 | 31 |
| Sep 2025 | 198 | 53 | 596 | 30 |
| Aug 2025 | 175 | 55 | 709 | 31 |
| Jul 2025 | 169 | 64 | 964 | 31 |
| Jun 2025 | 171 | 54 | 1,066 | 30 |
| May 2025 | 177 | 53 | 1,170 | 31 |
| Apr 2025 | 173 | 53 | 1,135 | 30 |
| Mar 2025 | 173 | 58 | 938 | 31 |
| Feb 2025 | 167 | 46 | 857 | 28 |
| Jan 2025 | 160 | 51 | 974 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1972-07-19 | 295 | 205 | 39 | 40 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
37.167768, -109.280430
Every well in San Juan County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.