Patterson Unit 1
API 43037305100000 · San Juan County, Utah · PATTERSON CANYON field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 447 | 346 | 720 | 27 |
| May 2026 | 404 | 275 | 692 | 29 |
| Apr 2026 | 745 | 692 | 795 | 30 |
| Mar 2026 | 295 | 474 | 118 | 17 |
| Feb 2026 | 0 | 0 | 0 | 0 |
| Jan 2026 | 0 | 0 | 0 | 0 |
| Dec 2025 | 0 | 0 | 0 | 0 |
| Nov 2025 | 0 | 0 | 0 | 0 |
| Oct 2025 | 0 | 0 | 0 | 0 |
| Sep 2025 | 131 | 253 | 308 | 16 |
| Aug 2025 | 259 | 577 | 594 | 31 |
| Jul 2025 | 279 | 658 | 637 | 31 |
| Jun 2025 | 255 | 401 | 590 | 26 |
| May 2025 | 276 | 325 | 607 | 31 |
| Apr 2025 | 273 | 355 | 554 | 26 |
| Mar 2025 | 298 | 310 | 629 | 31 |
| Feb 2025 | 290 | 305 | 595 | 28 |
| Jan 2025 | 281 | 212 | 657 | 25 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALSOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1980-04-25 | 294 | 720 | 20 | — | — | 20 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
37.517429, -109.197624
Every well in San Juan County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.