WV 43
API 43047154710000 · Uintah County, Utah · WONSITS VALLEY field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 229 | 0 | 6,288 | 30 |
| May 2026 | 234 | 0 | 6,577 | 31 |
| Apr 2026 | 229 | 0 | 6,586 | 30 |
| Mar 2026 | 237 | 0 | 7,083 | 31 |
| Feb 2026 | 209 | 0 | 6,680 | 28 |
| Jan 2026 | 227 | 0 | 5,981 | 31 |
| Dec 2025 | 238 | 0 | 6,156 | 31 |
| Nov 2025 | 195 | 0 | 6,365 | 30 |
| Oct 2025 | 227 | 0 | 6,673 | 31 |
| Sep 2025 | 256 | 0 | 6,917 | 30 |
| Aug 2025 | 207 | 0 | 6,643 | 31 |
| Jul 2025 | 201 | 0 | 7,066 | 31 |
| Jun 2025 | 193 | 0 | 6,590 | 30 |
| May 2025 | 223 | 0 | 7,127 | 31 |
| Apr 2025 | 337 | 0 | 7,136 | 30 |
| Mar 2025 | 167 | 0 | 7,124 | 31 |
| Feb 2025 | 174 | 0 | 5,578 | 28 |
| Jan 2025 | 215 | 0 | 5,953 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1965-12-13 | 228 | 152 | 0 | 30.34 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.132792, -109.529011
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.