AVU 05
API 43047156850000 · Uintah County, Utah · ASHLEY VALLEY field
Production
17 monthly filings with Utah, Feb 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 268 | 0 | 68,800 | 30 |
| May 2026 | 218 | 0 | 68,930 | 31 |
| Apr 2026 | 256 | 0 | 67,340 | 30 |
| Mar 2026 | 248 | 0 | 70,528 | 31 |
| Feb 2026 | 262 | 0 | 63,176 | 28 |
| Jan 2026 | 219 | 0 | 69,005 | 31 |
| Dec 2025 | 194 | 0 | 70,061 | 31 |
| Nov 2025 | 207 | 0 | 68,280 | 30 |
| Oct 2025 | 221 | 0 | 71,196 | 31 |
| Sep 2025 | 272 | 0 | 68,100 | 30 |
| Aug 2025 | 259 | 0 | 69,481 | 31 |
| Jul 2025 | 266 | 0 | 78,515 | 31 |
| Jun 2025 | 244 | 0 | 79,854 | 30 |
| May 2025 | 255 | 0 | 80,323 | 31 |
| Apr 2025 | 216 | 0 | 79,234 | 30 |
| Mar 2025 | 307 | 0 | 82,875 | 31 |
| Feb 2025 | 229 | 0 | 73,808 | 28 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1949-06-20 | 173 | 0 | 0 | 31 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.364315, -109.423329
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.