Government 1-13

API 43047160410000 · Uintah County, Utah · BUCK CANYON field

PAGWPlugged 1962-08-02
API
43047160410000
Operator
Tenneco Oil Company
County
Uintah
Completed
1962-09-11
Plugged
1962-08-02
Measured depth
6,500 ft

Work history

Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPAGW
Completed
1962-08-02
First production
1962-09-11
Measured depth
5,546 ft
True vertical depth
5,546 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1962-09-1102,3950———

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

Location

39.775783, -109.513125

39.77578, -109.51313 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.