CIGE 27
API 43047307380000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 5 | 1,681 | 41 | 30 |
| May 2026 | 6 | 1,721 | 42 | 31 |
| Apr 2026 | 8 | 1,676 | 52 | 30 |
| Mar 2026 | 7 | 1,824 | 63 | 31 |
| Feb 2026 | 7 | 1,685 | 58 | 28 |
| Jan 2026 | 8 | 1,863 | 62 | 31 |
| Dec 2025 | 7 | 1,944 | 46 | 31 |
| Nov 2025 | 7 | 1,888 | 42 | 30 |
| Oct 2025 | 6 | 2,049 | 43 | 31 |
| Sep 2025 | 4 | 2,344 | 43 | 30 |
| Aug 2025 | 5 | 2,347 | 41 | 31 |
| Jul 2025 | 6 | 2,519 | 44 | 31 |
| Jun 2025 | 6 | 2,550 | 40 | 30 |
| May 2025 | 6 | 2,570 | 39 | 31 |
| Apr 2025 | 7 | 2,562 | 38 | 30 |
| Mar 2025 | 8 | 2,750 | 38 | 31 |
| Feb 2025 | 7 | 2,311 | 34 | 28 |
| Jan 2025 | 8 | 2,662 | 38 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1980-12-30 | 0 | 1,900 | 0 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
39.997750, -109.449364
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.