H D Landy 1-30A1E

API 43047307900000 · Uintah County, Utah · BLUEBELL field

POW
API
43047307900000
Operator
Crescent Energy Operating, LLC
County
Uintah
Measured depth
12,950 ft

Production

18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.

Cumulative oil
8,059 bbl
Cumulative gas
8,582 MCF
Cumulative water
17,369 bbl
PeriodOil (bbl)Gas (MCF)Water (bbl)Days
Jun 20264284241,19330
May 20265065161,40429
Apr 20265455751,48830
Mar 20266375691,43031
Feb 20266576451,31928
Jan 20267828141,59231
Dec 20251,0541,0462,01231
Nov 20254066351,20830
Oct 20254865541,04512
Sep 20250000
Aug 20250178031
Jul 2025034031
Jun 202505602
May 2025059031
Apr 202528131756616
Mar 20257696471,42031
Feb 20256776921,23228
Jan 20258318211,46026

A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.

Work history

Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.

DRILL

VERTICALPOW
Completed
1980-11-20
First production
1980-11-20
Measured depth
12,950 ft
True vertical depth
12,950 ft

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
1980-11-201,5487731142——

A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.

REPERF

POW

Location

40.370581, -109.927916

40.37058, -109.92792 · Surface location as filed with Utah

Every well in Uintah County, Utah

Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.