Roosevelt A-7
API 43047314020000 · Uintah County, Utah · BLUEBELL field
Production
17 monthly filings with Utah, Jan 2025 to May 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| May 2026 | 158 | 87 | 165 | 14 |
| Apr 2026 | 421 | 192 | 495 | 30 |
| Mar 2026 | 520 | 195 | 547 | 31 |
| Feb 2026 | 409 | 195 | 514 | 28 |
| Jan 2026 | 496 | 249 | 649 | 31 |
| Dec 2025 | 223 | 145 | 319 | 11 |
| Nov 2025 | 392 | 225 | 480 | 26 |
| Oct 2025 | 732 | 522 | 573 | 31 |
| Sep 2025 | 378 | 589 | 583 | 30 |
| Aug 2025 | 834 | 731 | 626 | 31 |
| Jul 2025 | 361 | 719 | 708 | 30 |
| Jun 2025 | 321 | 61 | 352 | 13 |
| May 2025 | 365 | 241 | 424 | 22 |
| Apr 2025 | 530 | 353 | 619 | 30 |
| Mar 2025 | 540 | 302 | 681 | 31 |
| Feb 2025 | 492 | 259 | 608 | 28 |
| Jan 2025 | 584 | 332 | 735 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 3 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALSOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1984-05-29 | 846 | 544 | 56 | 39 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWREPERF
POWLocation
40.383906, -109.932853
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.