Walker Hollow U 69
API 43047316650000 · Uintah County, Utah · WALKER HOLLOW field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 239 | 25 | 430 | 30 |
| May 2026 | 310 | 27 | 485 | 31 |
| Apr 2026 | 301 | 27 | 408 | 30 |
| Mar 2026 | 289 | 32 | 428 | 31 |
| Feb 2026 | 257 | 32 | 384 | 28 |
| Jan 2026 | 271 | 29 | 398 | 31 |
| Dec 2025 | 261 | 24 | 394 | 30 |
| Nov 2025 | 276 | 23 | 403 | 30 |
| Oct 2025 | 276 | 28 | 441 | 31 |
| Sep 2025 | 275 | 23 | 403 | 30 |
| Aug 2025 | 263 | 18 | 346 | 31 |
| Jul 2025 | 244 | 12 | 254 | 31 |
| Jun 2025 | 249 | 4 | 25 | 30 |
| May 2025 | 265 | 4 | 32 | 31 |
| Apr 2025 | 317 | 69 | 72 | 30 |
| Mar 2025 | 315 | 98 | 95 | 31 |
| Feb 2025 | 289 | 64 | 88 | 28 |
| Jan 2025 | 261 | 80 | 91 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 1 record of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1986-02-27 | 195 | 0 | 0 | 25.3 | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
Location
40.236825, -109.296961
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.