Federal 2-28E19E
API 43047328490000 · Uintah County, Utah · MOFFAT CANAL field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 683 | 378 | 7 | 30 |
| May 2026 | 717 | 391 | 7 | 31 |
| Apr 2026 | 683 | 378 | 4 | 30 |
| Mar 2026 | 726 | 391 | 6 | 31 |
| Feb 2026 | 653 | 353 | 4 | 28 |
| Jan 2026 | 704 | 391 | 6 | 31 |
| Dec 2025 | 725 | 391 | 7 | 31 |
| Nov 2025 | 689 | 378 | 7 | 30 |
| Oct 2025 | 706 | 391 | 9 | 31 |
| Sep 2025 | 698 | 378 | 6 | 30 |
| Aug 2025 | 729 | 391 | 6 | 31 |
| Jul 2025 | 717 | 391 | 13 | 31 |
| Jun 2025 | 621 | 378 | 28 | 30 |
| May 2025 | 737 | 391 | 8 | 31 |
| Apr 2025 | 741 | 378 | 6 | 30 |
| Mar 2025 | 740 | 391 | 16 | 30 |
| Feb 2025 | 666 | 353 | 14 | 26 |
| Jan 2025 | 943 | 391 | 19 | 30 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPOWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1997-08-27 | 56 | 0 | 21 | — | — | — |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
RECOMP
POWLocation
40.358467, -109.802476
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.