N Duck Creek 107-25
API 43047335050000 · Uintah County, Utah · NATURAL BUTTES field
Production
18 monthly filings with Utah, Jan 2025 to Jun 2026. Each product is in its own unit and the four are never added.
| Period | Oil (bbl) | Gas (MCF) | Water (bbl) | Days |
|---|---|---|---|---|
| Jun 2026 | 0 | 1,035 | 0 | 30 |
| May 2026 | 0 | 1,193 | 0 | 31 |
| Apr 2026 | 0 | 1,143 | 0 | 30 |
| Mar 2026 | 0 | 949 | 0 | 31 |
| Feb 2026 | 0 | 1,097 | 0 | 28 |
| Jan 2026 | 18 | 764 | 83 | 31 |
| Dec 2025 | 0 | 1,260 | 0 | 31 |
| Nov 2025 | 0 | 1,331 | 0 | 30 |
| Oct 2025 | 0 | 775 | 0 | 31 |
| Sep 2025 | 0 | 1,212 | 0 | 30 |
| Aug 2025 | 1 | 1,290 | 15 | 31 |
| Jul 2025 | 0 | 1,321 | 0 | 31 |
| Jun 2025 | 15 | 1,207 | 97 | 30 |
| May 2025 | 0 | 1,211 | 0 | 31 |
| Apr 2025 | 0 | 1,119 | 0 | 30 |
| Mar 2025 | 0 | 1,073 | 0 | 31 |
| Feb 2025 | 0 | 802 | 0 | 28 |
| Jan 2025 | 0 | 1,144 | 0 | 31 |
A dash is a period the well filed with no volume for that product. This corpus holds Utah’s series from 2025; the Division publishes earlier years in a separate set of files.
Work history
Utah files 2 records of work done on this well — each drill, plug, deepening, re-entry, re-perforation and recompletion, with the depths reached. One carries a production test the operator filed afterwards.
DRILL
VERTICALPGWProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2000-05-23 | 3 | 817 | 13 | — | — | 14 |
A production test is one measurement the operator made on one day and filed with Utah. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Utah records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Utah did not file, or one it filed outside any physically possible range.
REPERF
PGWLocation
40.088922, -109.499881
Every well in Uintah County, Utah
Utah state record, from UT_wells_Wells.parquet. Corpus built 2026-09-11.